The Connswater Community Greenway is now in Phase 2 of the construction with Farrans announced as the contractor.

Phase 1 construction which is now complete focused  on Victoria Park and Orangefield Park. Phase 2 construction will focus on the remaining areas of the Connswater Community Greenway. Rivers Agency will be working on the stand alone East Belfast Flood Alleviation scheme during the Connswater Community Greenway construction. These works will specifically target the flood alleviation works along the greenway route. 

The design work for Phase 1 has been created by McAdam Design who were appointed to design and manage these sections.

Phase 2 design will be managed by ARUP who have been appointed to finalise the design of Phase 2. ARUP will revisit the previous design of all parts of the CCG (other than Victoria and Orangefield Parks).

Information sessions for Phase 2 have already been carried out to give local residents and businesses the opportunity to view and comment on the design before construction takes place. If you would like to view the design sections you can do so online by exploring the greenway map.  If you need any assistance with this tool please email stephanie@eastbelfastpartnership.org with your query or telephone 028 9046 7925